[ Mail ] To All Union Members: Request for quotation for 19000 Hyperspace Nodes
Open in chat • 6 posts (analysis)
• Page 1 of 1
((OOC: Replies are assumed to be to the Veolian Commonwealth only, unless clearly noted otherwise.))
((OOC: Im not sure whether it is possible to immediately follow up in the same turn as the previous project completes. If possible I have no problems with the current flow, if not, some scheduling needs to be done in order not to overflow.))
6 posts (analysis)
• Page 1 of 1


, with future intentions to buy an additional 33000
.
. Prices, alternative compensation, and duration are all open to negotation. Up front investments to assist with the creation of industrial or infrastructural necessities can be discussed.
, as the goods will be used together.
, at a rate of 1 : 1. Alternatively we would be willing to discuss a price in